After Hours Service Emergencies
315-214-5286

Fulton Thermal

June 18, 2024

Mechanical Engineer:
Argus Engineering

Architect:
Mcknight Architects

Equipment:
DaikinMcQuay Aircooled Chiller, Semco Rooftop Energy Recovery Ventilators, Trox Active Chilled Beams, Evapco Cooling Towers.

Description:
Fulton wanted their new corporate headquarters to utilize a state of the art mechanical system which would take advantage of their high efficiency condensing boilers. This system includes radiant floor heating and Trox active chilled beams for cooling. The Trox beams are an integral part of the industrial architectural layout designed for the office area. This system provides for optimal comfort in the conditioned space with efficient operation.